08 Sep
08Sep

The renewables market is burgeoning and RAFT Systems has recently been involved in planning and installing microwave radio links for an off-shore wind farm. This has initially involved link planning, link factory acceptance testing and equipment installation onto an off-shore sub-station in the fabrication yard prior to it floating out. It is anticipated that final link commissioning will take place during the summer once the off-shore sub-station is in place.

We are able to provide the following services:

  •  Link Planning
  •  Link Factory Acceptance Testing
  •  Microwave Radio Testing
  •  Microwave Radio Installation
  •  Link Commissioning
  •  Maintenance Services
  •  Rigging Services
  •  Microwave Radio Supply
  •  Fault Finding
  •  Project Management
  •  Production of Method Statements and Safety Documentation


All of our field staff are accredited with major operators and hold OPTIO HUET and GWO for off-shore operations.

We have total capability from design through to continuing support.

All work is carried out in line with RAFT’s Quality Standards which is aligned to BS ISO 9000.

To enquire about our services or how we can provide assistance on your projects, please email salesadmin@raft-systems.co.uk